Conducting Total Station Survey To Fix The Alignment And For Conducting Soil Test At An Interval Of 50m Along Water Way. 12 Nos Bore Locations Proposed And Out Of This 2 Bore Holes Are In Land Portion. Provisions (EXPIRED)