1 Inch Installation Tool Of Lock Bolting Machine 1) Supply And Fitment Of The Item Anvil 2) Nose Assembly Bore Damage, Zero Pulling And Pushing Load -Release And Hold Ejector Material Filling, Grind Ing, Jig Boring, Hardening, Machining Work 3)Cylinder Boar Damage - Material Filling, Jig Boring 4) Lock Cylin Der Bush Damage - Machining, Thread Taping, Milling 5) Advance And Return Lone Connector Line Leakage - Cl Eaning And Machining, Seal Kit Replacements 6) Complete Seal Kit Replacement 7) Hose Replacements With Qrc With High Pressure Fittings Load Test @ Maximum Pull Push Load With 700 Bar Pressure. [ Warranty P Eriod: 30 Months After The Date Of Delivery ] ]