Adding The Capacity To Receive 4,000 Teu Container Ships At Berth 3 Of Vung Ang Port And Increasing The Capacity To Receive General Cargo Ships Of Up To 70,000Dwt (Reduced Load) At Berth 2 And Berth 3 Of Vung Ang Port