Study Of The Following Development Works: I – Exterior Painting Of 03 (Three) Blocks With Four Facades: - Block 1: R+2 Building Containing 32 (Thirty-Two) Rooms - Block 2: Ground Floor Building Containing Three Large Amphitheaters - Block 3: R+2 Containing 28 Classrooms Ii – Waterproofing Treatment In 04 (Four) Classrooms And One Day Iii- Development And Maintenance Work A Conference Lecture Hall Which Will Be Transformed Into A Lecture Hall: Painting Inside; Repair Of Windows; Supply And Installation Of Tiling On The Floor; Acquisition And Installation Of A Wooden Entrance Door; Acquisition And Installation Of Fabric Curtains; Removal Of Old Tables And Seats; Acquisition And Installation Of New Seats And Tables; Electrical Renovation And Installation Work (Lamps, Cables, Sockets, Etc.) Iv- Development And Maintenance Work On A Company Accommodation Consisting Of Two Bedrooms, A Kitchen And A Bathroom (Ground Floor): Interior And Exterior Painting; Tiling, Interior And Exterior Doors, Windows, Kitchen, Sanitary Facilities.