Supply,Installation,Commissioning & Testing Of Stainless Steel Tubes And D Ouble Ferrule Fittings For Lhb Non-Ac Hot Buffet Car Coaches. Note:-Installation Charg Es Are To Be Given/Quoted Separately., As Per Drawing: Rcf/Md/Mat Sch/Lwcbac , Ver-01 Wit H Design Correction Slip No.-01 & 02 Dated 02/04/2025 & 08/04/2025 Respectively. Seperate Pa Cking Of Furnishing And Bogie Items (Furnishing Items:- Set List Items Page 01 Group A, B, Tube Length & Pipe Clamps. Bogie Items:- Set List Items Page 02, Group E, F & G)., Packing Inst Ruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]