Sw-I- Nanded Division: Mmr-Awb Section (Srden/W/Ned)Provision Of Safety Fencing / Boundary Wall Of Along The Track For Speed 130Kmph And Above Using Nhai Anti-Crash Barrier / W-Beam Steel Fencing For 115 Km Fencing Length (Phase-I)(Irpsm Id 11.04.16.24.3.53.002 Fy 2024-25)( Balance Works- Drain Works Only)Sw-Ii- Nanded Division: Awb-J Section (Srden/W/Ned): Provision Of Safety Fencing / Boundary Wall Of Along The Track For Speed 130Kmph And Above Using Nhai Anti-Crash Barrier / W-Beam Steel Fencing For 85 Km Fencing Length (Phase-I)((Irpsm Id 11.04.16.24.3.53.001 Fy 2024-25) (Balance Works- Drain Works Only)Sw-Iii-Nanded Division: Mmr-J Section(Sr.Den/W/Ned) Provision Of Safety Fencing Along The Track For Speed 130Kmph And Above Using Nhai Anti-Crash Barrier / W-Beam Steel Fencing For 64.58 Km Fencing Length(Phase-Ii).(Irpsm Id 11.04.16.24 .3.53.004 Fy 2024-25) (Balance Works- Drain Works Only)