Link Road To Murarai Health Centre With Extension Upto Bajitpur From 0.00Kmp To 0.800Km Widening And Strengthening Work And From 0.800Km To 7.00Km Strengthening Work Including Construction Of 11 Nos Cd Structure, Protection Work, Surface Drain Under Birbhum Highway Division I In The District Of Birbhum.