Lwscz Shell Kit (A) Lscz - One Coach Set Of Roof, 2 Mm Sidewall And End Wall For Lwscz Coaches. 1) Sidewall Assembly To Drg.No. (329) Icf/Sk3-1-4-091, Alt 'B' , Col- 1 - 1 No. 2) Roof Assembly To Drg.No. (Lwscz) 73916001, Alt 'D', Col-I - 1 No. 3) End Roof Assembly To Drg.No.(Ls) 58116066, Alt 'H', Col-I - 2 Nos. Welding Pin To Drg No 81410012 Alt Nil To Be Assembled On Roof And Sidewall 4) Endwall To Drg. No. (Lslrd) 74115001, Alt 'J'-2 Nos. The Firm Shall Fulfil The Requirement As Per Icf//Md/Specn.200, Issue Statu S 01, Rev 04 With Amendment No. 01. The Firm Shall Fulfil The Requirement As Per Icf/Md/Spec-315, Issu E Status-01, Rev.00, Amendment No. 01. Firm Has To Supply Roof And Sidewall Without Applying Etch Primer. (B)O Ne Coach Set Of Body Shell Items And Partition Frames For Lwscz2(814) Coaches To Drg Nos, 1. 814100 02, Alt Nil- 1No. 2. 81410005, Alt 'E'- 1 No. 3. 58210036, Alt 'B'- 2 Nos. 4. 67010011, Alt 'A'- 2 Nos. 5. 58110017, Alt 'C'- 2 Nos. 6. Aag10457, Alt Nil- 4 Nos. 7. Aab10338, Alt Nil-16 Nos. 8. 58110015, Alt 'A'- 6 Nos. 9. 58110016, Alt 'A'- 3 Nos. (C) Under Frame Arrangemnt To Drg No. 81411001 Alt 'F' The Manufacturing Facility As Per Icf/M D/Spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : A) -Packing As Per Icf/J&T/Mi Sc-2201, Alt 'E', Safety Instruction As Per Icf/J&T/Sk-1867, Alt. 'Nil' -Packing As Per Icf/J&T/Sk-1809, Alt ' A'. B) - Packing Condition As Per Icf/J&T/Sk-1865, Alt "A". C) Packing Condition As Per Drg.No.Icf/J&T/Misc- 2487, Alt 'B' The Underframe Should Be Supplied As Normal Side Up And Side Bearer Side Down. Stage Inspection Details. (A) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (B) Jig Sta Ge # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Ch Ecked & Recorded (C) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (D) Surface Preparation And Painting Stage. # Short/Sand Blast To The Requirements. # Painting Process As Per The S Pecification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spe C Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-Metallic Corrossion. [Safety Item] [ Warranty Period: 30 Months After The Date Of Deli Very ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lac S ] ]