Object: Preparation Of Basic And Executive Engineering Studies And Projects For The Implementation And Paving Works Of The Br-376/Ms Route Variant, Connecting The New Bridge Designed In Porto São José/Pr To The City Of Nova Andradina/Ms, With An Approximate Length Of 57.90 Km