Execution Of The Works Included In The Executive Project Deposit For The Reception Of Cleaning Trucks For The Edar De Manresa (Exp. 10407) Demolition Of The Current Deposit Box And Construction Of A 40M3 Deposit Box, Channel Connections Of The New Tank At New Well, With An Automatic Sieve In One Of The Channels And Installation Of A Metal Structure For Bivalve At The Entrance Of The Manresa Wwtp, In Order To Receive The Collector Cleaning Trucks Or Of Discharges