2025-0074, Work On Heating And Central Hot Water Systems As Well As Gas, Water And Wastewater Installation Systems In The Framework Contract In Accordance With §4A Vob/A In The Period 01.07.2025 To 30.06.2028 For The City Of Leverkusen