Construction Of Renewable Energy Installations Operating Within The Island Network, I.E. Off Grid (Solar And Vertical Wind Turbines) With A Total Nominal Output Ac 1.63 Mw, With A 6 Mwh Electricity Warehouse And Energy Management System At The Mpk Base In Świdnica At Ul. Engineering 6, For The Needs Of "Green Energy" For The Vehicle Charging Station.