Supply And Location Of Applications And Equipment And Construction Of The Required Infrastructure Of The Basket Stage In Thivas The Municipality Of Municipality: 535.870.00 €, Plus Vat 24% Amount: 128.608.80 €, Ie Total: 664.478.80 €