Package No. 11 (Xl-01): Construction Of Bac Lieu Canal Overpass, Roads And Works On The Route From The Beginning Of The Route To Km3+000 (Including Equipment Costs, Specialized Laboratory Costs, Costs To Ensure Traffic Safety, Other Costs Related To Implementing The Package And Contingency Costs For Arising Volumes)